北京pk10全部赛车记录

page contents ');}) ();

These steps are needed for permeable brick repair

share to:
更新时间:2018年07月01日01:01:11 打印此页 关闭 Hits: 1098 Updated: July 1, 2018 01:01:11 Print this page Close
Whenever possible, use the same time to repair the old bricks. Bricks cannot be locked on both sides of the iron plate. The plates between two ring bricks should be staggered. Can't make a pot between the old and new tile interface.

Ceramic permeable bricks must be the same as the same batch of bricks in the old brick factory. The sealing of the first few circles of the bricks must be from the side of the brick mouth, and the final brick sealing ring should be selected actively. For removal, it is necessary to dig. The establishment of the fullness of the wet brick fireproof mud must reach more than 95%. It is strictly prohibited to display bricks with no fire soil and small heads with refractory clay. If you have this situation, you should remove the rebuilding in time.

The ceramic digging brick of the permeable brick starts from the weakest part of the brick, but it cannot be digging more than three rings of bricks together.If it is a multi-ring excavation to avoid slack bricks as a whole, it is necessary to dig 2 rings to continue digging Back. Pay attention to the elasticity of the bricks when excavating the bricks. If there are loose bricks as a whole, stop excavating immediately, use bricks to lock and tighten, loosen the brick walls on both sides, and admit that they are not loose before you continue Digging operations.

Therefore, in the work, we must explore the permeability of ceramic tiles.In addition to complying with the corresponding guidelines, we must also pay attention to some related matters, so as to improve its operating power and reduce damage.
下一条: 陶瓷透水砖的施工方法流程 Previous: How powerful is the function-permeable brick Next: Construction method flow of ceramic permeable brick