The use of high-rise masonry shear wall structure systems will not add construction costs. Some people worry that the reinforcement of the building will be added. If the shear wall structure is selected by the external wall insulation method, a 25 mm thick plaster mortar is used. Insulation, post tiles or bricks, or dry hanging stone, glass crafts, etc.


The load of the exterior wall decoration wall of these methods is 120 kg / m2, and the sintered porous brick serves as the surface layer. The load is only 140 ~ 150 kg / m2, and the calculation is fine. The results are the same. The wall can save 60% of the cost of the insulation layer, and has completely solved the problems existing in the construction of the external wall insulation system.


The sintered porous brick shear wall system for the external wall coating system has the planning Atlas and standards issued by the Ministry of Construction.In Northeast China, a significant proportion of high-rise construction has been applied to the system, but the general KP1 porous It is not advisable to add the engineering cost and the complexity of the construction outside the brick wall and plaster wall.


First of all, the sintered porous brick shear wall structure can save data and can play a certain energy-saving role.It also promotes the insulation effect to a certain extent.In order to extend its service life, regular protection is required.