北京pk10全部赛车记录

page contents ');}) ();

Cement pipe drying precautions, watering is required at the same time

share to:
更新时间:2018年08月13日03:29:34 打印此页 关闭 Clicks: 925 Updated: August 13, 2018 03:29:34 Print this page Close
Cement pipe is a kind of prefabricated pipe made of cement and steel bars. It can be used as the city's sewage pipe and the water pipe used in some special factories and mines. How useful to add the strength and straightness of the nozzle? The following editors introduce you:
Because the vertical core mold oscillating tube manufacturing process uses two overall tube molds on the front and back, the rigidity of the mold is very good and it is not easy to deform, and only one set of mold is required for a standard. The tube body has no closing seam, and the finish of the inner wall of the tube is significantly improved compared with the centrifugal process and the suspension roll process. In addition, the vertical core-mold oscillating pipe making process rotates and kneads the concrete again in the axial direction after the concrete is fed, which more effectively adds the strength and straightness of the nozzle, and the construction device is smooth.
After the cement pipe is exposed to sunlight, its strength will decrease with the rapid evaporation of water, or even be completely lost. Therefore, it is necessary to strictly clean and fully wet the bottom layer before construction; after construction, it should be covered strictly and watered in accordance with standard rules. The communication starts from the heart, the service is transmitted by feelings, and it exceeds the customer's needs, which is better than satisfying. I look forward to working with you. What are the precautions for the use of cement pipes? This is also one of the important factors for the long service life of cement pipes.
1. It is necessary to check whether each department is normal before using it. Recognize that the hoses are firmly connected.
2. The center of gravity of the heavy object should be selected properly, the force point of the electric jack should be reasonably selected, the bottom surface should be leveled, and the soft and hard conditions on the ground should be taken into consideration.
3. After the electric jack is pushed into the heavy object, it should be supported firmly with a support in time to prevent the electric jack from being used as a support.
4. For the electric pump, please refer to the operation manual of the electric pump.
5. If the amount of oil in the pump is insufficient, you must first join the pump to work with oil.
6. When using, you should strictly abide by the rules in the main parameters, and avoid overloading. Maybe you will continue to suppress after arriving at the trip, otherwise, when the lifting height or lifting tonnage exceeds the rules, severe oil leakage will occur at the top of the cylinder.
下一条: 水泥管的闭水试验结果是怎样的,万信来告诉你 Previous : How to avoid the leakage of cement pipe during construction Article 1: What is the result of the water-tight test of cement pipe, Wanxin will tell you