Matters needing attention in the production of cement products

share to:
更新时间:2018年12月18日09:48:12 打印此页 关闭 Clicks: 706 Updated: December 18, 2018 09:48:12 Print this page Close

Normally, we need to maintain and cover the concrete within 12 hours after the cement product is poured. As for the maintenance time: for concrete mixed with portland cement, general portland cement or slag portland cement, it must not be less than 7 days, and for concrete with retardation admixture or impermeability In 14 days, the number of sprinklers should be able to keep the concrete in a wet state, and the maintenance water should be the same as the mixing water.

Points to note: If the average temperature of the day is less than 5 degrees Celsius, do not sprinkle water. Cover the concrete for maintenance with plastic cloth. The exposed surface should be tightly covered and the plastic cloth should be kept condensed.

下一条: 侧面透水砖的各项优势 Prev: The difference between concrete cement pier and plastic water horse is great Next: The advantages of side permeable bricks