How to make the cement isolation pier?

share to:
更新时间:2018年12月27日10:07:59 打印此页 关闭 Clicks: 645 Updated: December 27, 2018 10:07:59 Print this page Close

At present, there are a lot of traffic facilities on the highway. In order to ensure the safety and smoothness of the highway, various transportation facilities are also constantly being improved. So today let Wanxin Cement Prefabrication Factory introduce us to the most common production process of cement isolation pier, let us understand more clearly how the cement isolation pier is made.

The first step is to assemble the mold.

The production of cement isolation pier requires the site to be level and clean. The first step is to cast 1 cm thick C20 concrete, and spread a thin iron sheet as the bottom mold together. The pier body formwork of the isolation pier Xiaochang uses custom steel formwork. What needs to be explained is that every time the template is cleaned and repaired before the device, the dust and other materials on the surface of the template must be cleaned. The final step is to polish, polish and modify the surface of the cement isolation pier .

The second step is to make the steel cage according to the required specifications after the mold is installed.

The next step is to pour into the concrete. Usually, the mixed concrete is fed into the mold according to the manual quantitative discharge and the reinforcing cage, and the most subject to manual flattening.

The final step is to place it on flat ground for natural maintenance, and the natural maintenance can be directly packed for transportation within 24 hours.