Matters needing attention in the construction of pc bricks and permeable bricks

share to:
更新时间:2019年01月09日09:08:02 打印此页 关闭 Hits: 1171 Updated: January 9, 2019 09:08:02 Print this page Close

PC bricks are very common in our lives, and the scale of use is also very wide. They are also guaranteed in quality. They are suitable for various pavement constructions. They are simple and elegant in appearance, and the cost of construction is not high. Therefore, color bricks are very marketable. So how should we improve the quality of construction? The following is to be notified by the editor of Guangzhou Wanxin Cement Product Factory.

First of all, when laying the colored bricks, we must do planning work well in advance, and then carry out construction by area. This will prevent mistakes in later construction, leading to the need to plan the laying from scratch, which will increase the amount of work.

Then, if the laying direction is covered by a manhole cover or a special object, the surrounding area should be laid early and the construction should be carried out from near to far. In the same process, in order to ensure the quality of the laying, it is also not possible to use inferior colored tiles for laying.

In addition, to prevent problems in the laying of colorful tiles, clean the colorful tiles and the ground early. The cement must be mixed evenly before use. This can also improve the efficiency and quality of construction.

Finally, after the laying of the colored bricks, it is not possible to walk on it immediately to prevent the cement from drying out and showing a displacement, which leads to a short life span in subsequent use. In addition, after the construction is completed, the entire area needs to be inspected and then reinforced and maintained to prevent it from falling during use.

Welcome to Guangzhou Wanxin Cement Product Factory

下一条: pc砖是如何安装铺设的? Previous: The characteristics of Guangzhou Wanxin imitation stone permeable brick Next: How is the PC brick installed and laid?