What are the requirements for the gap-laying construction of landscape bricks?

share to:
更新时间:2019年02月09日01:05:23 打印此页 关闭 Clicks: 663 Updated: February 9, 2019 01:05:23 Print this page Close

After laying the landscape tiles , if the gap is too large or too small, it will affect the overall effect, and the actual use quality is not good. Therefore, we not only need to ensure the quality of the landscape tiles, but also the appropriate laying and adhere to the appropriate landscape. Brick gap. Let's take a look at how to leave a suitable gap.

1. Leave a 10mm wide seam every 3 × 6 meters. You can leave a centimeter strip between the seams when laying, and take out the centimeter strip after laying, and then fill the joint with 1: 1 cement mortar to ensure that the width of the gray joint is uniform; Ensure that the gap between the tiles of the landscape brick is 2mm, and the gap is required to be horizontal and vertical.

Second, after paving the seams, spread a small amount of water on the surface layer, so that the bricks are soaked and saturated, and the interval is about 15 minutes. Use a decision and a wooden hammer to make a full blow in order. Then adjust the gap in the order of vertical and horizontal first, adjust the gap to be smooth and even, and then level the floor tile again after adjustment.

3. After paving the joints and filling the joints, clean the joints and wet them with water. Then, use a 1: 1 cement mortar joint in the local area with a joint width of 10mm. The remaining joints have a smaller joint width of 2mm. Use 1: 3 lime mortar grouting method. Improper local treatment with a scraper. The paved landscape brick joints should reach a uniform width and be uniform. The brick surface layer needs to be compact, smooth and smooth.