It is cold in winter, and it will cause certain difficulties during the laying of landscape bricks . If you do not pay attention to the construction method, it may lead to unsuccessful laying and delay the entire construction process. Let us understand below what problems should be paid attention to during the laying of landscape bricks. .

Generally, the normal average temperature in winter is basically below 5 ° C. Before the construction of the landscape brick works and after the winter construction is exempted, certain protection measures must be implemented. When it is sunny, it can be used outdoors, and in cold weather, it can be done indoors. It is necessary to reduce the time of low-temperature open-air operations, reduce the open-air operating surface on rainy days, and adopt the method of sub-building, segmentation, and sub-site sudden construction. The construction of the completed structure must be stopped to a certain position.

When arranging winter construction, it is necessary to consider the impact of temperature and snowfall. It is necessary to consider the working area and construction progress of winter construction, speed up labor deployment, emphasize reasonable process interspersion, learn to be better than using various favorable conditions, accelerate construction progress, and consider some maneuvers appropriately. Construction projects to strengthen production scheduling. It is necessary to classify the preparation work for winter construction into the production plan, consider the issue of labor, arrange a certain working time, and do a good job of storing engineering data and winter equipment during winter construction.

下一条: 景观砖的白霜问题该如何解决? Previous : Several ways to improve the hardness of landscape bricks Next : How to solve the hoar frost problem of landscape bricks?