Reinforced concrete cement pipe manufacturers explain the issues that need attention in the production

share to:
更新时间:2019年05月06日00:17:28 打印此页 关闭 Clicks: 437 Updated: May 6, 2019 00:17:28 Print this page Close

Reinforced concrete cement pipe manufacturers talk about the production of attention. Cement pipe is one of the commonly used equipment in our lives. It is very important for the normal work of our daily life, and it is corrosion-resistant and well-functioning. It is not a simple task to manufacture cement pipes. Next, we will pay attention to the manufacture of cement pipes. matter.

Cement prefabricated molds are used to produce cement pipes. For different cement pipes, there may be some differences in the later use. Cement prefabricated molds, prefabricated molds, cement prefabricated molds, cement pipe steel molds, concrete precast molds. , Cast-in-situ molds, high-speed railway molds, cast-in-situ iron molds, cast-in-situ concrete molds, port pool sheet pile molds, etc., these are common cement pipe molds, and the precast mold profession must first pay more attention to its product structure strategy In order to adjust the structure, the high-grade mold with complicated structure and high precision can be developed more quickly.

The production line of cement pipes is mainly composed of processes such as crushing and pre-homogenization, homogenization of raw material preparation, pre-heating decomposition, firing of cement clinker, cement grinding packaging. The cement machinery equipment includes a cement rotary kiln, a grate cooler, and a cyclone preheater.

Cement rotary kiln is the primary equipment for calcining cement clinker and has been widely used in cement, metallurgy, chemical and other occupations. The equipment consists of a cylinder, supporting equipment, supporting equipment with blocking wheels, transmission equipment, movable kiln head, kiln tail sealing equipment, incineration equipment and other components. The rotary kiln has the advantages of simple structure, reliable work, simple control during production and other features.

Under normal circumstances, we need to maintain and cover up the concrete within 12 hours after the cement pipe is poured. As for the maintenance time: for concrete mixed with portland cement, general portland cement or slag portland cement, it must not be less than 7 days, and for concrete with retardation admixtures or impermeability requirements In 14 days, the watering frequency should be able to keep the concrete in a wet state, and the maintenance water should be the same as the mixing water.

Pay attention to the points: if the average temperature of the day is lower than 5 degrees Celsius, do not water. Cover the maintained concrete with plastic cloth, and all exposed surfaces should be covered tightly, and there should be condensed water in the plastic cloth.

Our company has been developing into a brand enterprise for the production and processing of cement pipes in the southern region for more than ten years. We take the responsibility of making high-quality and excellent cement pipes as our mission. Old customers come to the factory to buy!