Cement pipe manufacturers explain how to install drainage pipes

share to:
更新时间:2019年05月16日02:27:36 打印此页 关闭 Clicks: 411 Updated: May 16, 2019 02:27:36 Print this page Close

Since most of the laying of cement pipes is underground, the handling of underground projects must follow the strict construction route to ensure the smooth progress of the project. Let's take the laying of underground pipelines in strict accordance with a certain process. The laying of cement pipelines is measured by laying lines-trench excavation-construction of pipeline roots-laying of pipelines, cleaning of pipes-concrete pouring inspection wells-township pouring -Trench backfilling: There are several processes. In the meantime, the most important foundation process is the measurement and pay-off. The measurement and pay-off is performed by a full-time survey operator, which requires strict measurement records and equipment that passed the check. Testing and measurement here require high standards and require precision. According to the plan drawing and the cross column records, check the level point, establish a temporary level point, do a good job of protection, and conduct closed retesting and control the elevation.

In addition, after the trench is dug, it is necessary to compound the elevation elevation in time to control the elevation of the excavated soil, the cushion and the root surface; and then compacted with a strip of stone to compact the soil, lay the steel bars, erect the formwork, and then pour the ground. . The order of piping should be arranged from low to high. Attention must be paid to the necessary problems in construction. Guangzhou Wanxin Cement Products Co., Ltd., welcome friends to buy!

下一条: 水泥管厂家解说影响水泥污水管的使用寿命原因 Previous : Cement pipe manufacturers direct sales Next : Cement pipe manufacturers Explain the reasons that affect the service life of cement sewage pipes