Cement pipes must play their role normally to ensure a long service life. Proper maintenance is very important. Many users do not know how to maintain cement pipes, resulting in poor use of cement pipes and a short service life. What about maintenance? Henan cement pipe manufacturer summarizes the key to you as follows:

There are two basic methods for maintaining cement pipes, one is steam curing, and the other is natural maintenance. First look at the steam curing method. This method is a manual maintenance method, that is, a steam curing pond dedicated to maintaining cement pipes is built. The detailed area size should be excavated according to its own practical needs. Generally speaking, the width About two meters, with a length of 4 meters and a depth of 3 meters, you can be satisfied with the maintenance of most cement pipes on the market. After the steaming pond is established, the steam required for maintenance needs to be transported to the pond through boiler heating and other means. During the transportation process, Stone cement pipe manufacturers must ensure that the steaming pond is sealed and properly prepared. The cement pipe is directly put into the steaming tank, and the steam can be effectively coagulated for about four hours. Of course, when the temperature is high, the required steaming time is short, and when the temperature is low, the required time is long. The demand depends on the detailed situation to determine the time of steaming.

Followed by natural maintenance law. Stone cement pipe manufacturers stated that the natural maintenance method is simple. When the cement pipe is made, it is placed directly in the open air environment, and then the foundation is maintained. The mold is opened the next day. Once in the morning, at night, and in the evening, maintenance of the cement pipe can be completed for about a week. Of course, the number of sprinklers should be determined based on detailed weather and temperature conditions.
下一条: 水泥管的模具时如何检测不及格的 Previous : Analysis of the raw material use of reinforced concrete drainage pipe Next : How to detect the failure of the mold