Steam curing method for curing cement pipe

share to:
更新时间:2019年09月09日12:47:09 打印此页 关闭 Clicks: 240 Updated: September 9, 2019 12:47:09 Print this page Close
We already know a lot about cement pipes, such as common cement pipes, cement drainage pipes, large-diameter cement pipes, etc. We all know a lot.

After the cement pipe is manufactured on the cement pipe making machine, the cement pipe and the cement pipe mold are hoisted into the steam curing tank for steam maintenance, which takes about 3-4 hours.

The steaming process requires 3 stages:

The temperature in a steam culture tank requires a time of about 1 hour from low temperature (30-40 degrees) to high temperature (100 degrees);

Two needs to maintain the high temperature (about 100 degrees) for about 1 hour;

Three from high temperature to low temperature also takes about an hour. After 3 hours, the cement tube is steamed and the concrete is solidified.

The basic conditions of a cement pipe plant. Provide some suggestions to friends who want to build a factory:

1.The factory site must have;

2. Hydropower must be fully equipped with corresponding transformers;

3.Basic auxiliary equipment: steaming tank boiler mixer gantry crane batching machine;

4. Cement pipe host cement pipe mold rebar winding machine roll welding machine.
下一条: 怎么选择质量好的水泥管 Prev: The role of cement pipe mixture Next: How to choose a good quality cement pipe