How to carry out water test after cement pipe landfill installation

share to:
更新时间:2019年09月22日15:20:33 打印此页 关闭 Clicks: 179 Updated: September 22, 2019 15:20:33 Print this page Close
When we installed the cement drainage pipe, it was not directly applicable after the installation was completed. In order to ensure that the cement drainage pipe will not have some water leakage and inconvenient drainage in the future use. We will test the water after the cement drainage pipe is assembled. This problem can be said to directly affect our use of cement drainage pipes in the future. Now let's take a look at some of the process of testing the cement drainage pipes with the cement pipe manufacturer Xiaobian!

Let's take a concrete drainage pipe used in the bathroom as an example to take a look at it! Sweep around the reserved drainage pipe mouth, remove the temporary pipe, and check whether there is any debris in the pipe. Find the centerline of the drain nozzle and draw it on the wall. Use a spirit level to find the vertical line.

Put the putty into the drain pipe socket, place the white plaster under the orientation of the squatting pan, and then insert the squeezing pan drainage port into the drainage pipe socket. Use a spirit level to lie on the top of the squatting pan together, level and straighten in both directions. Align the toilet bowl nozzle with the centerline of the wall. Put the bricks on both sides of the squatting pan together and wipe them off. Compact and polish the putty at the contact point of the squatting pan drainage port with the drainage pipe socket. Close the drain of the squatting pan temporarily.

When the flexible drainage pipe is used to install the multi-squatting pan, please check whether the elevation of the drainage pipe mouth and the dimensions of the wall from the wall are consistent. Find out the standard ground level, measure the height required for the toilet, and level it with a small line, find the wall space, and then install them one by one as described above.

Stable installation of high water tank: It should be done after the toilet is installed stably. First, check whether the center of the squatting pan is consistent with the center line of the wall surface. If there is a misalignment, adjust it in time. It is advisable that the squatting pan does not skew. Confirm the orientation of the centerline of the water tank outlet, and measure the prescribed height upward. Combine the space between the high water tank fixing hole and the water supply hole together to find the height orientation of the fixing bolts, draw a cross line on the wall, flush the debris in the eye of the hole with water, insert the dovetail bolt into the hole and twist it with cement. Hang the high water tank with the accessories on the fixing bolts, add rubber pads, eye circles, and tighten the nuts with moderate tightness.
下一条: 水泥管深埋的各项好方法 Previous : Cement pipe manufacturers repeatedly emphasize the problems that need to be paid attention to when laying cement pipes Next : Good methods for deep buried cement pipes