About cement pipe is one of the more common industrial pipes in our city. Due to its performance characteristics, we have widely used this pipeline equipment in many aspects. Of course, construction is very important when using it, because it directly affects the quality of our use in the later stages. To this end, today the editor of the cement pipe manufacturer Xiaobian will take a look at the skills and strategies of its construction.

During the construction of the pipeline, the midline of the pipeline to be constructed is determined, and a temporary level is established. The excavator is mainly used for trench excavation, and manual bottom cleaning is supplemented. The excavator excavates to a height of about 10cm at the bottom of the trench. It is reserved for the bottom of the trench to not be digged, and then manually removed to repair the bottom of the trench. Manually clear the trough, carefully check the soil at the bottom of the trough for any disturbance, and if there is disturbance, special treatment should be done. On both sides of the trench, 1 m above the bottom of the trench, an elevation pile is symmetrically arranged, and nails of equal height are nailed thereon. The height of the soil on one side of the groove is not more than 2 meters, and the distance from the margin of the groove is not less than 1 meter. For the maintenance of underground pipelines in trench construction, first ask the relevant departments to cross the pipeline to clear the fundamental orientation of the underground equipment. If necessary, excavate sample holes first to find out the exact orientation.

Construction Steady Pipe: Steady pipe is to stabilize the pipe on the basis of the designed elevation and plane orientation. Before stabilizing the pipe, remove debris, water, and the inside and outside of the pipe. When the pipe moves in the groove, the operator cooperates closely to prevent collisions. When stabilizing the pipe, the inner diameter and the bottom elevation of the pipe shall prevail.
下一条: 水泥管铺设时需要注意的问题 Previous: Issues needing attention when using pipe jacking Next: Issues requiring attention when laying cement pipe